A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

MEDIUM priority water allocations (ML)
CHINCHILLA WEIR WATER SUPPLY SCHEME Nominal Volumes as at COB 15th December 2016
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
CONDAMINE BALONNE ZONE CBS-01 2,022 2,022 2,884 2,022
CONDAMINE BALONNE ZONE CBS-02 0 61 61 61
CONDAMINE BALONNE ZONE CBS-03 0 75 801 75
CONDAMINE BALONNE ZONE CBS-04 0 726 726 726
All values in Megalitres

* This represents the forecasted ‘current volume’ assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.