A change to the location of a water allocation is possible between zones.

If the change can be made within the maximum and minimum constraints set by the trading rules then the change will generally be approved.

HIGH priority water allocations (ML)
BUNDABERG WATER SUPPLY SCHEME Nominal Volumes as at COB 15th December 2016
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Burnett Zone CA 8,840 34,323 36,570 34,323
Burnett Zone CB 0 2,225 37,050 2,225
Burnett Zone GZ 0 500 20,000 500
Kolan Zone AA 3,100 3,280 3,600 3,280
Kolan Zone AB 0 53 105 53
Kolan Zone AC 0 0 280 0
Kolan Zone AD 3,990 3,991 4,190 3,991
All values in Megalitres

* This represents the forecasted ‘current volume’ assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

MEDIUM priority water allocations (ML)
BUNDABERG WATER SUPPLY SCHEME Nominal Volumes as at COB 15th December 2016
Location Minimum Volume (ML) Current Volume (ML) Maximum Volume (ML) Projected Volume (ML) *
Burnett Zone CA 64,325 174,871 189,325 174,871
Burnett Zone CB 4,450 30,727 156,760 30,727
Burnett Zone GZ 2,855 21,234 41,235 21,234
Kolan Zone AA 36,025 38,053 42,553 42,553 +
Kolan Zone AB 2,785 2,921 6,790 2,921
Kolan Zone AC 0 2,147 5,160 2,147
Kolan Zone AD 46,750 61,504 67,180 61,504
All values in Megalitres

* This represents the forecasted ‘current volume’ assuming all outstanding dealing certificates or matters under review are registered on the water allocations register.

+ This projected volume includes 4,500 megalitres of Interim Water Allocation supplied in this zone yet to be converted to water allocation on the register